Reconstruction biotechnical production

Source: CSL Behring GmbH
Source: CSL Behring GmbH

Project:

  • Location: Marburg, Germany
  • Client: CSL Behring GmbH

Key data:

  • GFA: 500 m²
  • Processing: 2008 - 2009

Challenge:

  • Construction of a production line taking into account the underlying,
    existing production line
  • New ventilation center on roof with duct routing on the facade to the bottom

Services:

  • Basic Design
  • Detail Design
  • Construction Management

Fields of expertise:

  • Building engineering / HVAC
  • Electrical engineering
  • Building automation systems (BAS)

BUILDING types:

  • Production

Back zur Liste