New construction of administration building with canteen

Source: Aero Pump GmbH
Source: Aero Pump GmbH

Project:

  • Location: Hochheim, Germany
  • Client: Aero Pump GmbH

Key data:

  • GFA: 2.500 m²
  • Processing: 2007 - 2013

Challenge:

  • Component cooling
  • Thermal building simulation - compliance with comfort criteria

Services:

  • Conceptual Design
  • Basic Design
  • Detail Design
  • Construction Management

Fields of expertise:

  • Building engineering / HVAC
  • Electrical engineering
  • Building automation systems (BAS)
  • CFD-Simulation

BUILDING types:

  • Office / Administration

Back zur Liste