Project:
- Location: Dreieich, Germany
- Client: Biotest AG
Key data:
- GFA: 6.200 m²
- Processing: 2012 - 2016
Challenge:
- Wet sprinkler system for deep-freeze storage down to -37° C
- Fully redundant and fail-safe compound refrigeration system for deep-freeze storage and logistics
- Laboratory ventilation up to S3
Services:
- Conceptual Design
- Basic Design
- Detail Design
- Construction Management
Fields of expertise:
- Building engineering / HVAC
- Electrical engineering
- Building automation systems (BAS)
- Process planning
BUILDING types:
- Production
- Laboratory and research
- Logistics
- Infrastructure
- Office / Administration