Project:
- Location: Bonn, Germany
- Client: Eckert & Ziegler EURO-PET Köln/Bonn GmbH
Key data:
- GFA: 300 m²
- Processing: 2013 - 2015
Challenge:
- Construction in the existing building on the 2nd basement level with ongoing production next door
- Coordination of the different requirements regarding GMP conformity and radiation protection
- Prior coordination with the authorities and TÜV to ensure project safety
Services:
- Conceptual Design
- Basic Design
- Detail Design
- Construction Management
Fields of expertise:
- Building engineering / HVAC
- Electrical engineering
- Building automation systems (BAS)
- Process planning
BUILDING types:
- Production