Integration of aseptic filling into inventory

[Translate to English:] Eckert & Ziegler EURO-PET Köln/Bonn GmbH
[Translate to English:] Eckert & Ziegler EURO-PET Köln/Bonn GmbH
[Translate to English:] Eckert & Ziegler EURO-PET Köln/Bonn GmbH
[Translate to English:] Eckert & Ziegler EURO-PET Köln/Bonn GmbH
[Translate to English:] Eckert & Ziegler EURO-PET Köln/Bonn GmbH
[Translate to English:] Eckert & Ziegler EURO-PET Köln/Bonn GmbH

Project:

  • Location: Bonn, Germany
  • Client: Eckert & Ziegler EURO-PET Köln/Bonn GmbH

Key data:

  • GFA: 300 m²
  • Processing: 2013 - 2015

Challenge:

  • Construction in the existing building on the 2nd basement level with ongoing production next door
  • Coordination of the different requirements regarding GMP conformity and radiation protection
  • Prior coordination with the authorities and TÜV to ensure project safety

Services:

  • Conceptual Design
  • Basic Design
  • Detail Design
  • Construction Management

Fields of expertise:

  • Building engineering / HVAC
  • Electrical engineering
  • Building automation systems (BAS)
  • Process planning

BUILDING types:

  • Production

Back zur Liste