Project:
- Location: Jena, Germany
- Client: EVER Pharma Jena GmbH
Key data:
- GFA: 5.500 m²
- Processing: 2012 - 2015
Challenge:
- High-bay warehouse with temperature maintenance according to GMP specifications without mechanical cooling
- Thermal building simulation and flow simulation - Maintaining a room temperature between 15 - 25 °C
Services:
- Conceptual Design
- Basic Design
- Detail Design
- Construction Management
Fields of expertise:
- Building engineering / HVAC
- Electrical engineering
- Building automation systems (BAS)
- Simulation
- Process planning
- Qualification
BUILDING types:
- Production