Project:
- Location: Vevey, Switzerland
- Client: Merck-Serono SA
Key data:
- GFA: 36.000 m²
- Processing: 2007 - 2010
Challenge:
- Storage of finished products takes place in large refrigerated warehouses at 4°C and -20°C
- Production and preparation for the products takes place under clean room conditions
Services:
- Conceptual Design
- Basic Design
- Detail Design
Fields of expertise:
- Building engineering / HVAC
- Building automation systems (BAS)
BUILDING types:
- Production