New construction of 4 production halls

Source: HAWE Hydraulik SE
Source: HAWE Hydraulik SE

Project:

  • Location: Kaufbeuren, Germany
  • Client: HAWE Hydraulik SE

Key data:

  • GFA: 38.900 m²
  • Processing: 2008 - 2013

Challenge:

  • Technical concepts for the possibility of extending the 4 halls
  • Equipment concepts for high flexibility by the user
  • Use of special technology for machine exhaust air (filter system for cooling lubricants)

Services:

  • Conceptual Design
  • Basic Design
  • Detail Design
  • Construction Management

Fields of expertise:

  • Building engineering / HVAC

BUILDING types:

  • Production

Back zur Liste