New construction office building
Project:
- Location: Mindelheim, Germany
- Client: GROB-WERKE GmbH & Co. KG
Key data:
- GFA: 11.400 m²
- Processing: 2012 - 2013
Challenge:
- Extension with provisional in the existing building
- Sophisticated ceiling mirror
- Extensive conversion of 3rd floor and roof center before commissioning
Services:
- Conceptual Design
- Basic Design
- Detail Design
- Construction Management
Fields of expertise:
- Building engineering / HVAC
- Electrical engineering
- Building automation systems (BAS)
BUILDING types:
Back zur Liste