Conversion production hall / climate room

Source: GROB-WERKE GmbH & Co. KG
Source: GROB-WERKE GmbH & Co. KG

Project:

  • Location: Mindelheim, Germany
  • Client: GROB-WERKE GmbH & Co. KG

key data:

  • GFA: 1.200 m²
  • Processing: 2017 - 2018

Challenge:

  • Room in room with flexible workstations
  • Roof/ceiling installation, as no technical areas available in the existing building
  • Busbars as electrical engineering - supply concept

Services:

  • Conceptual Design
  • Basic Design
  • Detail Design
  • Construction Management

Fields of expertise:

  • Building engineering / HVAC
  • Electrical engineering
  • Building automation systems (BAS)

BUILDING types:

  • Production

Back zur Liste