Project:
- Location: Melsungen, Germany
- Client: B. Braun Melsungen AG
Key data:
- GFA: 22.750 m²
- Processing: 2019 - 2023
Challenge:
- Installation of fail-safe transformer systems through energy- and load-optimized transformer divisions
- Installation of an integrated building management system
- Clean room class (GMP): D
Services:
- Conceptual Design
- Basic Design
- Detail Design
- Construction Management
Fields of expertise:
- Building engineering / HVAC
- Electrical engineering
- Building automation systems (BAS)
BUILDING types:
- Office / Administration
- Production
- Logistics