Feasibility study - Sterile filling
[Translate to English:] ©Adobe Stock - Kalinovsky Dmitry
Project:
- Location: Marburg, Germany
- Client: CSL Behring GmbH
Key data:
- GFA: 1.500 m²
- Processing: 2024
Challenge:
- Addition to an existing building
- Parallel operation with existing production
- Partial connection to existing building
- Cleanroom classes (GMP): A - D
Fields of expertise:
- Building engineering / HVAC
- Electrical engineering
- Building automation systems (BAS)
- Process Planning
BUILDING types:
Back zur Liste