Factory planning - Cross ventilation in halls

[Translate to English:]
[Translate to English:]

Project:

  • Location: Ramadan City, Egypt
  • Client: Greenliner for paper industries S.A.E.

key data:

  • GFA: 1.400 m²
  • Processinng: 2024 - 2025

challenge:

  • Detailed ventilation planning, including all fastenings
  • Integration into 3D models / visualization for the client

Services:

  • Conceptual Design
  • Basic Design
  • Detail Design

Fields of expertise:

  • Building engineering / HVAC

BUILDING types:

  • Production

Back zur Liste