Energetic renovation of the town hall area

Source: Gemeinde Prittriching
Source: Gemeinde Prittriching
Source: Gemeinde Prittriching
Source: Gemeinde Prittriching

Project:

  • Location: Prittriching, Germany
  • Client: Gemeinde Prittriching

key data:

  • GFA: 3.300 m²
  • Processing: 2016 - 2019

Challenge:

  • Construction in the existing building stock in four construction phases during ongoing operation
  • Changeover to CO2-neutral heat supply using pellet boilers
  • Modernization of drinking water heating through decentralized instantaneous water heaters instead of boilers

services:

  • Conceptual Design
  • Basic Design
  • Detail Design
  • Construction Management

Fields of expertise:

  • Building engineering / HVAC

BUILDING types:

  • Office / Administration

Back zur Liste