Project:
- Location: Hochheim, Germany
- Client: Aero Pump GmbH
Key data:
- GFA: 12.500 m²
- Processing: 2004 - 2007
Challenge:
- Production is modularly expandable
- Product storage takes place in a conditioned high-bay warehouse
- All material transport is fully automated
Services:
- Conceptual Design
- Basic Design
- Detail Design
- Construction Management
Fields of expertise:
- Building engineering / HVAC
- Electrical engineering
- Building automation systems (BAS)
BUILDING types:
- Production