New building pharmacological research (S3)
Project:
- Location: Darmstadt, Germany
- Client: Merck KGaA
Key data:
- GFA: 5.000 m²
- Processing: 2005 - 2007
Challenge:
- Design of an automatic H2O2 fumigation system with suitable central smoke aspiration system
- Automatic lighting system with programmable day and night cycles for research
Services:
- Conceptual Design
- Basic Design
- Detail Design
- Construction Management
Fields of expertise:
- Building engineering / HVAC
- Electrical engineering
- Building automation systems (BAS)
- CFD-Simulation
- Process planning
BUILDING types:
Back zur Liste