New building for active pharmaceutical ingredient production
Project:
- Location: Oberburgau, Austria
- Client: EVER Neuro Pharma GmbH
Key data:
- GFA: 2.900 m²
- Processing: 2012 - 2015
Challenge:
- Multi-way heat pump (5 compressors) in combination with process waste heat and well water utilization
- Specific process load profile considerations
Services:
- Conceptual Design
- Basic Design
- Detail Design
- Construction Management
Fields of expertise:
- Building engineering / HVAC
- Electrical engineering
- Building automation systems (BAS)
- Process planning
BUILDING types:
Back zur Liste