New construction of climate chamber
Project:
- Location: Mindelheim, Germany
- Client: GROB-WERKE GmbH & Co. KG
Key data:
- GFA: 105 m²
- Processing: 2013 - 2014
Challenge:
- Room temperatures up to +45°C, constant conditions
- Limited space (room-in-room) - Clean room area 75 m²
- Detailed room data monitoring necessary
Services:
- Conceptual Design
- Basic Design
- Detail Design
- Construction Management
Fields of expertise:
- Building engineering / HVAC
- Building automation systems (BAS)
BUILDING types:
Back zur Liste