Conversion of clean room area for integration of new sterile filling system

Source: BIPSO GmbH
Source: BIPSO GmbH
Source: BIPSO GmbH
Source: BIPSO GmbH
Source: BIPSO GmbH
Source: BIPSO GmbH

Project:

  • Location: Singen, Germany
  • Client: BIPSO GmbH

key data:

  • GFA: 700 m²
  • Processing: 2014

Challenge:

  • Construction in existing buildings
  • Integration of process technology during ongoing production
  • Integration of high-purity media generators into existing piping and expansion with relocation of process equipment to other areas
  • Conversion in sections incl. pharmaceutical interior fittings

Services:

  • Conceptual Design
  • Basic Design
  • Detail Design
  • Qualification

Fields of expertise:

  • Building engineering / HVAC
  • Electrical engineering
  • Building automation systems (BAS)
  • Process planning

BUILDING types:

  • Production

Back zur Liste