Project:
- Location: Wedemark, Germany
- Client: Kirsch Pharma HealthCare GmbH
key data
- GFA: 4.400 m²
- Processing: 2016 - 2019
challenge:
- Design and implementation planning during the construction phase.
- Simulation: Temperature control of the warehouse by combining supply air and outside temperature to maintain a room temperature between 10° and 30° C
services:
- Conceptual Design
- Basic Design
- Detail Design
- Simulation
Fields of expertise:
- Building engineering / HVAC
- Electrical engineering
- Building automation systems (BAS)
- Process planning
- Laboratory planning
- Qualification
BUILDING types:
- Office / Administration
- Production
- Laboratory and research
- Logistics