New construction of production and administration

Source: Kirsch HealthCare GmbH
Source: Kirsch HealthCare GmbH
Source: Kirsch HealthCare GmbH
Source: Kirsch HealthCare GmbH
Source: Kirsch HealthCare GmbH
Source: Kirsch HealthCare GmbH

Project:

  • Location: Wedemark, Germany
  • Client: Kirsch Pharma HealthCare GmbH

key data

  • GFA: 4.400 m²
  • Processing: 2016 - 2019

challenge:

  • Design and implementation planning during the construction phase.
  • Simulation: Temperature control of the warehouse by combining supply air and outside temperature to maintain a room temperature between 10° and 30° C

services:

  • Conceptual Design
  • Basic Design
  • Detail Design
  • Simulation

Fields of expertise:

  • Building engineering / HVAC
  • Electrical engineering
  • Building automation systems (BAS)
  • Process planning
  • Laboratory planning
  • Qualification

BUILDING types:

  • Office / Administration
  • Production
  • Laboratory and research
  • Logistics

Back zur Liste