Project:
- Location: Hamburg, Deutschland
- Client: Desitin Arzneimittel GmbH
key data:
- GFA: 9.000 m²
- Processinng: 2017 - 2018
Challenge:
- incorporation of the needs for space, personnel, ventilation and refrigeration
during the staging of production from 1-shift to 3-shift
over a period of 10 years
Services:
- Conceptual Design
Fields of expertise:
- Building engineering / HVAC
BUILDING types:
- Production