Project:
- Location: Königsbach-Stein, Germany
- Client: Frey & Winkler GmbH
Key data:
- GFA: 420 m²
- Processing: 2017
Challenge:
- Upgrade of an existing injection molding production hall to
clean room class D - Consideration of existing building structures
Services:
- Conceptual Design
BUILDING types:
- Building engineering / HVAC
- Electrical engineering
- Building automation systems (BAS)
BUILDING types:
- Production