New building of 2-storey assembly hall with administration

Source: GROB-WERKE GmbH & Co. KG
Source: GROB-WERKE GmbH & Co. KG

Project:

  • Location: Mindelheim, Germany
  • Client: GROB-WERKE GmbH & Co. KG

key data:

  • GFA: 32.000 m²
  • Processing: 2017 - 2018

challenge:

  • Large hall structure with limited supply levels
  • Building-dependent smoke extraction concept
  • Equipment concepts for high flexibility by the user
  • Flow simulation - compliance with comfort criteria

Services:

  • Conceptual Design
  • Basic Design
  • Detail Design

Fields of expertise:

  • Building engineering / HVAC
  • Electrical engineering
  • Building automation systems (BAS)
  • Simulation

BUILDING types:

  • Production
  • Office / Administration