New building of 2-storey assembly hall with administration
Project:
- Location: Mindelheim, Germany
- Client: GROB-WERKE GmbH & Co. KG
key data:
- GFA: 32.000 m²
- Processing: 2017 - 2018
challenge:
- Large hall structure with limited supply levels
- Building-dependent smoke extraction concept
- Equipment concepts for high flexibility by the user
- Flow simulation - compliance with comfort criteria
Services:
- Conceptual Design
- Basic Design
- Detail Design
Fields of expertise:
- Building engineering / HVAC
- Electrical engineering
- Building automation systems (BAS)
- Simulation
BUILDING types:
- Production
- Office / Administration
Back zur Liste