new construction of a production building
Project:
- Location: Surabaya, Indonesia
- Client: Hertz Flavors GmbH & Co. KG
Key data:
- GFA: 3.000 m²
- Processing: 2016
Challenge:
- Special climatic conditions (high temperature and humidity)
to the conception heat and climatic cold for RLT - Electrically weak supply security to maintain production
- Use of photovoltaic systems with buffering via accumulators
Services:
Fields of expertise:
- Building engineering / HVAC
- Electrical engineering
- Building automation systems (BAS)
BUILDING types:
Back zur Liste