New construction of administration and production building
Project:
- Location: Schwerin, Germany
- Client: Ypsomed Produktion GmbH
key data:
- GFA: 25.000 m²
- Processing: 2016 - 2019
Challenge:
- Technical concepts for the possibility of expanding the site
- High power requirement - economical use of busbars
- High cooling demand injection molding machines - use of freecooling and separate cooling circuits
Services:
- Conceptual Design
- Basic Design
- Detail Design
- Construction Management
Fields of expertise:
- Building engineering / HVAC
- Electrical engineering
- Building automation systems (BAS)
BUILDING types:
- Office / Administration
- Production
Back zur Liste