Project:
- Location: Unterach, Austria
- Client: EBEWE Pharma Ges.mb.H. Nfg. KG
Key data:
- GFA: 7.000 m²
- Processing: 2008 - 2010
Challenge:
- Highly effective substances
- Chiller with 1MW can be used as heat source in winter time
- Wfl plant as cold and warm loop, AP plant and pure steam generator
services:
- Conceptual Design
- Basic Design
- Detail Design
Fields of expertise:
- Building engineering / HVAC
- Electrical engineering
- Building automation systems (BAS)
- Process planning
BUILDING types:
- Production
- Logistics