GMP-Upgrade Solids production

Source: Bayer Technology Services GmbH
Source: Bayer Technology Services GmbH

Project:

  • Location: Leverkusen ,Germany
  • Client: Bayer Technology Services GmbH

Key data:

  • GFA: 25.800 m²
  • Processing: 2014

Challenge:

  • Complete GMP upgrade of the solids operation over several floors with additional expansion
  • Gradual conversion during ongoing operation
  • Implementation of the new Chinese GMP regulations

Services:

  • Conceptual design
  • Consulting

Fields of expertise:

  • Building engineering / HVAC
  • Electrical engineering
  • Process planning
  • Qualification

BUILDING types:

  • Production