New construction of a training workshop

Source: GROB-WERKE GmbH & Co. KG
Source: GROB-WERKE GmbH & Co. KG
Source: GROB-WERKE GmbH & Co. KG
Source: GROB-WERKE GmbH & Co. KG

Project:

  • Location: Mindelheim, Germany
  • Client: GROB-WERKE GmbH & Co. KG

key data:

  • GFA: 5.200 m²
  • Processing: 2014 - 2015

Challenge:

  • Short planning and construction time
  • Gap building with small distances to neighboring buildings in the outside area
  • LED lighting in halls

Services:

  • Conceptual Design
  • Basic Design
  • Detail Design
  • Construction Management

Fields of expertise:

  • Building engineering / HVAC
  • Electrical engineering
  • Building automation systems (BAS)

BUILDING types:

  • Production

Back zur Liste