Project:
- Location: Mindelheim, Germany
- Client: GROB-WERKE GmbH & Co. KG
key data:
- GFA: 960 m²
- Processing: 2012 - 2014
Challenge:
- Long-term location considerations
- Consider expandability (optional buildings)
- Development in mixed-use area ("neighborhood constraints")
- Coordinate local heating routes with existing pipelines
- Limited space
Services:
- Conceptual Design
- Basic Design
- Detail Design
- Construction Management
Fields of expertise:
- Building engineering / HVAC
- Electrical engineering
- Building automation systems (BAS)
BUILDING types:
- Infrastructure